--Processing equipment |
|
| The quality of the products is always dependent on the quality of spare parts and the technological level of production processing available. In order to guarantee that the production quality of the air conditioners we make can occupy the most up-to-date achievement levels, Changhong has not hesitated to invest a huge sum of money, and to introduce the most advanced air conditioner production and processing equipment to ensure the highest possible quality of air conditioner production. |
| crumbles-free processing technics |
 |
Changhong Company is the first one introducing a complete set of crumbles-free processing equipments and technology from Japanese Sun Company and Italian GBS, completely solving the problem of air conditioners’ unusual noise caused by the copper crumbles’ dropping into compressors to conduce the pipe jam when copper pipes are processed. |
| High-speed punching mechine |
 |
The air-conditioner company’s 6 high-speed punches were introduced from Japan (whose brand names are Jingli and Aida). They all use the thin-quality hydrophilic aluminum foil. The thinnest one is 0.095 mm and the speed is as high as 320 times/minute which has reached the international leading level. The wings produced by the machine matched with the big U bend pipe and small U head makes up of the condensator and evaporator of the air conditioner. |
| Automatic Tube Expanding Machine |
 |
The machine was imported from the Japanese Rigao Precision Machinary Company. The big U bend pipe produced by the big U bend pipe machine insert among some aluminum foils to make up of the indoor & outdoor heat exchanger. But at this time, their combination is loose. While the Tube Expanding machine can inflate the big U bend pipe’s inner hole to fasten the combination which is more convenient for the heat exchangers’ storage in the product line and their transference and assembly. |
| Cleaning-free techinics |
> |
To guarantee the smooth operation of the copper pipes’ procession and heat exchangers’ production, the cooper pipes need lubricating. And to ensure the heat exchanging efficiency of the processed heat exchangers, the lubricating oil on the exchanger’s copper pipes must be cleaned to prevent the pollution to environment caused by the cleaning liquid with fluorin. |
| The automatic welding of the heat-exchangers |
 |
To maintain the flowing and stability of the heat exchangers’ big U bend pipe, the port’s fastening and jointing by the plate-metal and small U pipe is necessary. Changhong adopts the automatic jointing technologies to guarantee the product’s quality. |
| Digit Controlling tube bender |
> |
Changhong air conditioner company has introduced the digital controlling tube sets from Japan OPTON Company, which can produce copper pipes with various type and shape and reduce the jointing points of the full set copper pipes’ to improve the full set quality and producing efficiency. |
| Model pressing machine sets |
> |
The air conditioners’ plastic injection mainly including such parts as the indoor machine’s outline border and fans. The plastic injection machine sets Changhong air conditioner’s company adopts were all imported from Japan. They are 32 sets of Mitsubishi and Toshiba plastic injection machine and 2 complete set of fan procession inspection equipments. |
| Fan processing |
> |
The fan is the critical part of influencing the air conditioner’s performance figures such as noise and cooling & heating capacity. Due to the limitation of capital and technology, most of the home air conditioner manufacturers have to purchase them. Whereas, Changhong Air Conditioner Company has introduced a complete set of fan processing technology and equipments from the Japanese SANYO Company. |
| Plate-metal processing |
> |
The processing of the air conditioners’ plate-metal includes the following steps: pressing, jointing and painting. The company has 47 punch machines, 61 jointing equipments and 2 automatic static powder painting lines to meet the plate-metal processing requirement. |
| Electricity-controlling process |
> |
The controlling system is crucial to air conditioner products. Depending on the Changhong Group’s strong AI、SMT and parts processing capacity and itself’s advanced developingcompetence, Changhong air conditioner realizes the complete self-production of the controlling systems. Its products can not only satisfy the consumer’s requirements but also guarantee the quality at low cost, thus changhong air conditioneris quite competitive. |
| Whole-unit assembly |
> |
Changhong has five the most advanced automatic whole-unit assembly product line in the country. And changhong is also the first one to use such technologies reaching the international advanced level, such as Helium Vacuum Inspection, high precision automatic checking and so on.
All the air conditioners produced on the lines could be guaranteed to reach the designing requirements and be qualified to leave the factory. At the same time, those lines can manage each product’s quality by computers to ensure the products’ being tracked. |
| the assembly of the indoor units and the outdoor units |
The assembly of the indoor unit includes such working procedures as bottom border, middle border, front panel, heat exchangers, fan parts, special bend parts, electric-controlling, checking, shell, packing and so on. The assembly of the outdoor unit includes such working procedures as sole plate, compressor, heat exchangers, fan parts, special bending parts, valve parts, leak hunting, vacuuming, filling refrigerant, electric controlling, checking, shell, packing and so on. |
| Vacuuming product line |
> |
The whole set adopts the automatic vacuuming devices from LEYBOLD Co. Ltd. (Germany) to get the vacuum degree below 6 Pa. |
| Automatical refrigerant filling device |
> |
The company adopts the Automatical refrigerant filling devices. The producing staff connect the pipe’s tie-in with the outdoor unit’s technique tube to let the refrigerant-filling machine operate automatically to avoid the random caused by manpower filling which will influence the refrigerant’s filling quantity and to gurantee the stability of the whole-unit’s performance. |
| Automatic transmission line |
> |
After receiving the inspection in the checking room, the qualified products are transferred into the warehouse by automatic packing machine, elevating machine, transmission line and automatic transfering machine, which improves the production efficiency greatly. |
| Automatic machinery hands |
> |
All the air conditioner final products (including Window air conditioner, Wall-mounted conditioner and Cabinet air conditioner) is transferred on the automatic air transferring line and be downloaded from the line by the automatic machinery hands to the warehouse. |
|
|